03 / Service tiers
Every tier is billed per square metre of measured floor area. The measured survey comes first, and no fee range is confirmed before it.
| Tier | Fee, UAH per m² | Included | Not included |
|---|---|---|---|
| Essential drawing setPhases 1 to 3 | 780 – 1,050 | Measured survey, drawing pack, one revision round, finish specification sheet | Site supervision, contractor procurement |
| Full studio deliveryPhases 1 to 6 | 1,450 – 1,950 | Everything in the drawing set, three revision rounds, tender comparison of contractor quotes, weekly site visits, phase handover checklist | Furniture purchase, bespoke joinery drawings |
| Turnkey interiorsPhases 1 to 7 | 2,300 – 3,100 | Everything in full studio delivery, joinery drawings, procurement of finishes and lighting, styling, snag list close-out | Structural engineering, permit filing |
Because every contractor prices the same numbered rows, differences between quotes become visible. Read the scope sheet extract.
The finishes decision closes at the end of Phase 4. A decision that arrives late shifts the handover date by the same number of days.
Book the measured survey02 / Scope sheet
Every row below is priced on the same numbered sheet, so quotes from different contractors line up line by line instead of arriving as one lump sum.
| No. | Description | Unit | Qty | Phase | Duration band | Price range |
|---|---|---|---|---|---|---|
| 01 | Measured survey, existing-condition plan, dimensioned sheet | m² | 68 | P1 Survey | 1 week | UAH 12,900–16,300 |
| 02 | Demolition of non-loadbearing partitions, tile removal | m² | 41 | P2 Strip-out | 2 weeks | UAH 46,000–58,000 |
| 03 | Plumbing and drainage rough-in, relocated water points | point | 9 | P3 Rough-in | 2 weeks | UAH 38,500–47,000 |
| 04 | Electrical rough-in: circuits, back boxes, wall chases | point | 46 | P3 Rough-in | 3 weeks | UAH 52,000–64,000 |
| 05 | Cement screed and heated floor mat, 60 mm build-up | m² | 63 | P4 Substrate | 2 weeks | UAH 71,000–86,000 |
| 06 | Two-coat plaster skim and primer, walls and ceilings | m² | 214 | P4 Substrate | 3 weeks | UAH 128,000–155,000 |
| 07 | Oak engineered flooring laid and finished, skirting fitted | m² | 58 | P5 Finishes | 2 weeks | UAH 164,000–198,000 |
| 08 | Snag walk-through, touch-up and handover pack | m² | 68 | P6 Handover | 1 week | UAH 9,400–12,000 |
The measured survey is the first paid deliverable, so no fee range is confirmed before it. Finishes decisions close at the end of Phase 4: see the decision deadlines. To have these rows priced for your plan, send the floor plan through the request form.
05 / Decision deadlines
Each phase closes on a dated sign-off. The finishes decision falls at the end of Phase 4; a missed decision shifts the timeline by the same number of days.
Working days counted from the phase start date printed on the signed scope sheet. Deadlines as of 01 March 2025.
The finishes decision is the one that cannot be deferred: it closes Phase 4 and holds the order list for every trade that follows. Book the measured survey to fix your phase start dates.
05 / FAQ
The survey comes first, quotes are priced on identical numbered rows, work stops at the scope line, and remote clients run on the same schedule.
Yes. The survey is the first paid deliverable and no fee range is confirmed before it, because the areas it records are the quantities every later row is priced against. Photographs and floor-plan copies are never enough to open a tier.
Because every contractor prices the same numbered rows, differences between quotes become visible in one place instead of hiding in descriptions. Ask each bidder to return the extract with description, unit, quantity, phase and duration band intact.
Structural works, window replacement and every item marked excluded on the scope sheet stay outside the fee. The finishes decision falls at the end of Phase 4, and a missed deadline shifts the published duration band rather than compressing it.
Remote clients are served on the same phases and the same fee bands. Video walkthroughs replace some site visits, decisions are signed digitally, and the measured survey is still booked before any range is quoted.
Not sure which tier fits your flat? Send the address, floor area and rooms, and we will book the survey. Request the measured survey.